Beta 450 Manuale Utente Pagina 14

  • Scaricare
  • Aggiungi ai miei manuali
  • Stampa
  • Pagina
    / 20
  • Indice
  • SEGNALIBRI
  • Valutato. / 5. Basato su recensioni clienti
Vedere la pagina 13
14
14
Assembly Procedure 1450 Tower - 3T
Attach two diagonal braces from lower frame
to upper frame in accordance with bracing
pattern.
Attach one more diagonal brace from 1st
rung to 3rd rung of upper frame.
14.
15.
Repeat step 11 and climb through the
trap.
Fit horizontal braces to both sides of
platform at 1st and 2nd rungs above
platform level to form permanent handrail.
It is safe to use the platform once horizontal
braces are locked and secured in place.
17.
18.
Repeat steps 13 to 18 until desired height has been reached (max. height
8m outdoors and 12 m indoors).
Place xed platform initially at 4m level
(diagonally) and slide across to opposite
side of tower (as shown) from where
operative is standing below then place
trapdoor platform ensuring that trap is
placed at same side to trap on platform
below.
Note Ensure that the trapdoor hinge is to
the outside edge.
16.
DISMANTLING THE TOWER
The following instructions describe the steps necessary to dismantle the BETA
tower utilising the 3T method.
For your safety and that of others, take particular care not to allow
components to fall to the ground since this will not only result in damage
but may cause serious injury.
At top platform level unlock horizontal
braces at furthest positions from the trap
before descending through the trap.
1.
Vedere la pagina 13
1 2 ... 9 10 11 12 13 14 15 16 17 18 19 20

Commenti su questo manuale

Nessun commento