Beta 450 Manuale Utente Pagina 11

  • Scaricare
  • Aggiungi ai miei manuali
  • Stampa
  • Pagina
    / 20
  • Indice
  • SEGNALIBRI
  • Valutato. / 5. Basato su recensioni clienti
Vedere la pagina 10
11
The tower must be checked on a daily basis and after any
signicant weather changes e.g. high winds, snow, frost.
Use the checklist below prior to use.
Tower is vertical and square
Tower structure is correct and complete
Braces correctly tted and secure
Castors locked/ legs correctly adjusted
All castors, base plates and stabilisers are in contact with
the ground
Toeboards located and xed correctly
Correct stabilisers tted, adjusted and secure
Hand rails tted and secure
Platforms locked and secure in position
If a box has not been ticked, do not use the tower until the fault is
rectied.
Where a fault is found, access to the tower must be stopped.
Daily Checks
Vedere la pagina 10
1 2 ... 6 7 8 9 10 11 12 13 14 15 16 ... 19 20

Commenti su questo manuale

Nessun commento